4.13.2013


Another two bite the dust! Another two projects down. Yep, a few weeks months (Jan 2013) ago I completed the Washer and Dryer stands and painted the oldest boys room. I started this post then, but got side tracked by other projects. Since then I have completed wood floors in the Office and Stone Stacked the Fireplace. I'll write about those later.

These were the inspirations I used to make my washer dryer stands. Of course her finished products are awesome. I tried to re purpose some 2 year old wood, from another project. I thought I could pressure wash it and get the old funk off. Instead it furred all the wood and I had to sand it anyway. My Competent neighbor came over and said "What is That?" I told him about my plans to stain it and he said no way dude, paint it. 

I didnt think it would be this hard to build a square box....I think this was probably the ugliest thing I have ever built in my life. Ever. Luckily I had some left over high gloss white paint. I globbed about 4 coats on this thing and called it good. The first install didnt fit. I was a 1/8 inch off on one end so I had to go lop off the legs on one side. Its still level, and the washer and dryer are still on them.




BT

12.16.2012

DIY laminate flooring

One of the projects my favorite wife wants me to do I've been wanting to do was rip out the carpet in the living room and replace it with hardwood floors. Wife wants to rip out all carpet in the house, but I'm not so sure about that. I wanted to rip it out because the previous owners had indoor dogs, and you know what happens with pets indoors. At any rate, I've been cheap and hardheaded looking and pricing for a while, until I found this little store on the south side of town that sold flooring cheap. 15 boxes later, all shoved in the back seat of the ford focus, we have new flooring.


Its laminate flooring, not real hardwood. Its cheap inexpensive too. $.89 per square foot. Yep you read that right eighty nine cents a square foot. So cheap I was afraid to buy it cheap. The store had about 8 square feet on display, and it looked really good. The problem I've seen with most laminates is they just look plastic. Especially the ones with the texture really close together. I The wife did not want a smooth floor because it leaves streaks when you clean it. At our house in Colorado footprints and streaks showed up very well. This one is textured but its a larger texture.

Picked it up on a Thursday night and started ripping out the carpet then. I've ripped out carpet before, and expected a mess, luckily I was surprised. Though I could see where the dogs had gone to the bathroom a lot of times. Our dogs will go in a certain spot on the carpet pretty often as well. Another reason we wanted to rip out the carpet.

My living room had one section of carpet surrounded by tile. This area is only 272 square feet. I guess it only took about an hour to rip out the old stuff, and tear up the tack strips. Also had to replace one tile. Luckily there were more in the attic. 
The DIY shows sure do make it look easy to put this stuff in. It took me close to 3 hours to get about 5 rows down before I gave up for the night. Once my neighbor came over the next day, the rest of the flooring went down in about 3 hours. It only really took me us a day to get the flooring down. Here is the finished product sans transition. Pretty simple overall.


So my loving wife I decide this last weekend to finish it for reals, and add the transition. Mostly I was waitin on payday. The dang transition cost half the price of the flooring! I was well...floored! Straight edges are easy, and I was lazy figured I could keep a 90 and just cut a 45 and it would fit in the angle.... um no. The two pieces below are actually the same width. Back to the drawing board....Ended up cutting each piece at 22.5 degrees to make the 45 deg angle. That's probably common sense to everyone else.
 The other little area I had to fix was at the door jamb of the hallway. It wasn't a mistake I made thankfully, just how it all came together and needed a little touch up. Here is the original picture, and then what I did to it. Basically cut a piece of transition in half and glued it in place. It just cleans it up.


 For the most part the T Transition was easy. I bought a flooring that was the same height as my tile. I just did not put enough space around the edge of the floor so I had to take a circular saw and cut it. Yes cut it indoors. Yes, sawdust is everywhere. Yes I know.....And finally here is the finished product. I think it turned out great and the wife likes it to. The dogs are not used to it yet, and I worry the big Lab will slip and hurt himself. I think he is mad at us for pulling out the carpet. He sleeps on the rug in the kitchen now. I swear he is the most pathetic dog in the world.

Finally some lessons learned. I cant stress this enough, buy, beg, borrow, but get the RIGHT tool for the job. I'm cheap, and hardheaded. This is not a good combination for DIY projects. The right tools make it easier, and much nicer in the end. Lots less flowery 4 letter words, and back pains. And as I write this contemplating the next project (stacked stone wall), I wonder how I can get away with doing it cheaper.....Oh and get a competent neighbor!

BT

11.25.2012

Busy Work

Well the list of projects keeps growing. Ive actually added a list on the sidebar so I can keep up with it. Ive also knocked a few things off the list. I'm currently working on the washer and dryer stands, but am having to rethink the plans part way though it. I did recycle some old scrap wood into saw horses! We made it through the Turkey Holocaust, and are full on decorating for Christmas. I'm trying to convince CINC Home to let me rip out the carpet in the living room and stain the concrete floor before the tree goes up but she wants nothing of it. BT

7.30.2012

2 projects down

Well yesterday I finished the balance beam for my little gymnast, and today I finished the floating shelves er shelf in one bathroom.

I made the shelf from a hollow core door, ripped in half, stained and mounted on the wall. I ripped down some 2x4 to mount it to the back wall. They dont truly float though, being the trustworthy type I am, I added some small L brackets under neath to support it. The plan was for 2 shelves in here but the wife only wanted one. I think it would look better with two. 



The balance beam is made from a 4x4. It has a layer of foam padding on top and is wrapped in carpet. The carpet is glued on all 4 sides and stapled on the bottom. 2x4s cut down to 18 inches were placed 10 inches from the end.


I still need to create shelves in the master bath, but I didnt cut these long enough. I couldnt remember for the life of me why I bought two doors, oh yeah, the other shelves were going to be longer.

BT